Application of the Equipment Replacement Dynamic Programming Model in Conveyor Belt Replacement: Case Study of a Gold Mining Company

Loading...
Thumbnail Image

Journal Title

Journal ISSN

Volume Title

Publisher

MCSER Publishing

Abstract

As assets age, they generally deteriorate, resulting in rising operating and maintenance costs and decreasing salvage values. In this paper a comprehensive Dynamic Programming-based optimisation solution methodology is used to solve the equipment replacement optimisation problem on the replacement of conveyor belts at a Gold Mining company in Zimbabwe. Given a mining setup with one and two-year old conveyor belts the ultimate objective is to keep or replace the conveyor belt such that the overall cost of material handling is minimised within a five-year period. The findings reveal that this mining system should replace conveyor belts yearly. It is concluded that, an equipment replacement policy for conveyor belts is a necessity in a mining system so as to achieve an optimal contribution to the economic value that a mining system may accrue within a period of time.

Description

Open access journal article

Citation

Zvipore, D.C, Nyamugure, D.,Maposa,D and Lesaoana M. (2015).Application of the Equipment Replacement Dynamic Programming Model in Conveyor Belt Replacement: Case Study of a Gold Mining Company. Meditteranean Journal of Social Sciences, 6 (2) p 605-612.

Endorsement

Review

Supplemented By

Referenced By