Application of the Equipment Replacement Dynamic Programming Model in Conveyor Belt Replacement: Case Study of a Gold Mining Company
dc.contributor.author | Zvipore, David C. | |
dc.contributor.author | Nyamugure, P | |
dc.contributor.author | Maposa, D | |
dc.contributor.author | Lesaoana, Maseka | |
dc.date.accessioned | 2018-11-19T12:44:12Z | |
dc.date.accessioned | 2023-06-23T13:32:54Z | |
dc.date.available | 2018-11-19T12:44:12Z | |
dc.date.available | 2023-06-23T13:32:54Z | |
dc.date.issued | 2015-02 | |
dc.description | Open access journal article | en_US |
dc.description.abstract | As assets age, they generally deteriorate, resulting in rising operating and maintenance costs and decreasing salvage values. In this paper a comprehensive Dynamic Programming-based optimisation solution methodology is used to solve the equipment replacement optimisation problem on the replacement of conveyor belts at a Gold Mining company in Zimbabwe. Given a mining setup with one and two-year old conveyor belts the ultimate objective is to keep or replace the conveyor belt such that the overall cost of material handling is minimised within a five-year period. The findings reveal that this mining system should replace conveyor belts yearly. It is concluded that, an equipment replacement policy for conveyor belts is a necessity in a mining system so as to achieve an optimal contribution to the economic value that a mining system may accrue within a period of time. | en_US |
dc.identifier.citation | Zvipore, D.C, Nyamugure, D.,Maposa,D and Lesaoana M. (2015).Application of the Equipment Replacement Dynamic Programming Model in Conveyor Belt Replacement: Case Study of a Gold Mining Company. Meditteranean Journal of Social Sciences, 6 (2) p 605-612. | en_US |
dc.identifier.issn | 2039-2117 | |
dc.identifier.issn | 2039-9340 | |
dc.identifier.uri | http://196.220.97.103:4000/handle/123456789/959 | |
dc.language.iso | en | en_US |
dc.publisher | MCSER Publishing | en_US |
dc.subject | Dynamic programming | en_US |
dc.subject | Conveyor belt | en_US |
dc.subject | Optimization | en_US |
dc.subject | Replacement | en_US |
dc.subject | Equipment replacement | en_US |
dc.title | Application of the Equipment Replacement Dynamic Programming Model in Conveyor Belt Replacement: Case Study of a Gold Mining Company | en_US |
dc.type | Article | en_US |